- What famous Christmas carol became the first song ever broadcast from space? “Jingle Bells”
- Who invented electric Christmas lights? Thomas Edison in 1880.
- What year was Santa born? 270 AD.
- What vegetable allows Santa’s reindeer to fly? Carrots.
- Which alcohol is usually added to the base of Christmas trifles? Sherry.
- Which drinks manufacturer is said to have popularized Santa’s red and white costume? Coca-Cola.
- Which country started the tradition of putting up a Christmas tree first? Germany.
- When was the first Christmas tree lit up in the Rockefeller Center? 1933
- Which president had his own special recipe for eggnog? George Washington.
- In A Christmas Story, what gift does Ralphie receive from his aunt? A pink bunny suit.
- What should we leave out for Santa on Christmas Eve? Milk and cookies.
- How do you say Merry Christmas in Hawaiian? Mele Kalikimaka.
- Which alcoholic ingredient is used in a Snowball cocktail? Advocaat.
- What was the original title for “The Little Drummer Boy”? “Carol of the Drum”
- Which fairy tale served as an inspiration for the first gingerbread houses? Hansel and Gretel
- In the song “Last Christmas”, who does the singer give their heart to? Someone special.
- What is the most recorded Christmas song of all time? “Silent Night.”
- What alcohol is used to “spike” eggnog? Rum.
- Who wrote the popular Christmas song “Frosty The Snowman”? Walter Rollins and Steve Nelson.
- Name Santa’s reindeer: Dasher, Dancer, Prancer, Vixen, Comet, Cupid, Donner, Blitzen and sometimes Rudolph..