The Chief 0 Posted November 7, 2014 Report Share Posted November 7, 2014 Well, finally got the lights on the house. Headed to Florida for a week so going to be crazy to get it all up before Thanksgiving light up day. Link to post Share on other sites
mwalz 110 Posted November 8, 2014 Report Share Posted November 8, 2014 I have the roof outlined and putting all house lights on tomorrow. Sunday hopefully getting my 3 mega trees up....... Link to post Share on other sites
castlechristmas 6 Posted November 8, 2014 Report Share Posted November 8, 2014 Sitting here on PC forums doing my best to avoid going out and getting on the roof..... Uh oh, coffee is almost gone..... I guess it's time to start.......... Sigh....... Link to post Share on other sites
Billings North Pole 0 Posted November 8, 2014 Report Share Posted November 8, 2014 So for all sides of the house wrapped roof done 5 mega trees done now working on the candy cane fence before Sundays cold weather lol... still have a long way to go. Link to post Share on other sites
Roger 15 Posted November 8, 2014 Report Share Posted November 8, 2014 Got light wall (24 polls / 7 sections) up, 18 foot mega tree up with half of 96 strands with red, white, blue, green up, star on top, red, white, blue, green icicles on two houses. Icicles are mounted on 14 foot pvc pipe and hung on 10 inch gutter nails. 2 Power panels with 20 breakers each set, will wire cords as needed to breakers. Link to post Share on other sites
Bill V 65 Posted November 9, 2014 Report Share Posted November 9, 2014 Hmmmmmmm 30-35% up, waiting for first light this morning to hit it hard. Link to post Share on other sites
Alberta Bound 3 Posted November 11, 2014 Report Share Posted November 11, 2014 I'm miles from you folks in Alberta, Canada & I am out there in snow & -15 weather putting up stuff. Thank God I had the trees up when it was a bit warmer a couple of weeks ago. Link to post Share on other sites
Stephen Blue 25 Posted November 24, 2014 Report Share Posted November 24, 2014 Significantly behind here. Probably will be static lit on Dec 1 as planned, but the show section likely won't be completed until Friday the 5th. Undertook 3 major projects this year... don't know what I was thinking. Converting my show 10' trees to a welded steel rod structure so I never have to rig them again. Built a 20' "pole-less" walk-in mega tree, and doubled the amount of walking path with the forest & scenes to go along with the extended run. it's basically a shell right now, but it's going to be incredible. Good news is we survived the 25-30mph winds overnight with no discernible damage, so what we've done is good to go. Wednesday is going to be a washout but Thursday-Sunday is looking good, going to be a major sprint. Link to post Share on other sites
JR Kahuna 0 Posted November 25, 2014 Report Share Posted November 25, 2014 I have been doing a little here and a little there since the say after Halloween. Almost finished. Redid how I run cords and bought some waterproof containers to help prevent the GFI from tripping when it rains. I lost probably 8 days last year because of rain. Very disheartening. Also had electrician put outside outlets on their own breaker Turned most of it on tonight and found some snafus. Link to post Share on other sites
mwalz 110 Posted November 25, 2014 Report Share Posted November 25, 2014 About 75% done, looking to finish up Wednesday aafternoon. Link to post Share on other sites